Client: Des Caling Pty Ltd
Project: Hydraulic Lift Dog House mounted on a Skid - Gas Drilling Industry
Detail: In conjunction with a consulting engineer the entire project was designed, drafted and fabricated at Equifab before being commissioned on site.
The ‘Dog House’ project from design to installation went exceptionally well. When commissioned, the ‘Dog House’ operated as planned immediately the hydraulics were connected. No modifications were required.
It also fitted well to the drill rig, and was an instant success with the drill crew.
Outcome:
All parties deemed its field operation and performance to be highly effective.