Client: DPI Tick Fever Centre (through a third party building contractor)
Project: Elevated floor; mounted with stock holding pens in a quarantine facility.
Detail: The DPI provided a basic design. Equifab contracted ICR Drafting to assist with designing and drafting of the final product.
Structural members, panels, gates and ramps had to be designed to fit through an entrance measuring 2.0m x 2.0m and be manually handled, whilst maintaining the highest quarantine procedures. Components were installed and welded in place.
Outcome: Project stakeholders were impressed with the high quality solution, timeliness of manufacture, efficient installation and the professional management of the project logistics.